Green Line Trolley Station Trolley Green Line
Passive Parks
Parking
Community Hike and Bike Loop
Campus
Residential
SDSU Master Vision Plan
Built Environment
Natural Environment
Multipurpose 35,000-seat stadium 
Existing San Diego Trolley Green Line
Stadium
The stadium and all associated facilities would cover approximately 650,000 square feet of the project site. The stadium field would consist of natural turf, the concourse would include an outdoor assembly area with benched seating canopy trees, native understory, and ornamental understory/natural turf. 
Shared Active Parks
Community Hike and Bike Trail
Mobility
Hotel and Conference Center
Active Parks
Surface
Bike Lane and Path
Underground
The residential area would be comprised of sixteen buildings totaling up to 4,600 residential units. The buildings range from 70,000 square feet to 490,000 square feet and will be 3 to 24 stories in height. 300 units are for student/faculty/staff housing.
Approximately 4,600-residential homes 
Approximately 1.6 million sq. ft. of campus space 
Trolley Stations
16 mixed-use academic, administrative, and public/private-partnership office buildings will range from 3 to 5 stories in height, and range from 50,160 square feet to 150,450 square feet. These structures would encourage the transfer of ideas and technology and foster new research. [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE
Hotels and Conference Center
Two hotels would provide a mix of hotel and residential uses and comprise a total of 400 hotel rooms. The structures support visitors and stadium-related events,  provides conference facilities and serves as an incubator for graduate and undergraduate students in SDSU’s hospitality and tourism management program. [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE
Shared active parks
The proposed project would include a River Park, walking paths and trails, and associated open space for the shared use of the campus and community. Landscaping features, such as paseos, malls, greens, and green space, would be interspersed throughout the campus [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE
Active parks
The parks and recreation portion of the River Park includes flexible use turf event/play areas, play structure(s), basketball courts, volleyball courts, softball field(s), soccer field(s),, picnic areas, children’s play areas, multipurpose courts, walkways, landscaping, and parking [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE
Passive parks
The proposed park improvements include passive park uses, walking and biking trails, river buffer to protect native vegetation, and measures to mitigate drainage impacts and ensure compliance with water quality standards.  [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE
Existing San Diego Green Line Trolley
The proposed new campus is also connected to the main campus by the MTS Trolley Green Line and transit stations, with an existing trolley station in the south-central portion of the existing parking lot on the project site. [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
The existing San Diego Trolley station, accessible via the Green Line, traverses the project site and runs toward downtown San Diego to the west and Santee to the east. The SDSU main campus is three trolley stops from the on-site trolley station [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
Fenton Parkway Station
Stadium Station
Trolley Plaza
Trolley Stations
Hike and Bike Loop
A 4.11-acre, 2.35-mile hike and bike loop would connect to the proposed hike and bike trail at multiple points and circle the project site. Plantings include canopy trees and native/established understory. The loop would include fixed-bench seating and bike racks [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
Hike and Bike Trail
A 4.17-acre, 2.01-mile hike and bike trail would be located throughout the parks and recreation portions of the River Park. Approximately 40% of the trail would be comprised of plantings and approximately 60% comprised of hardscape.The trail would include fixed-bench seating and bike racks.  [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
Bike Lane and Path
Approximately 0.69 miles of bike lanes and paths would provide bike access within the campus/academic areas. Signage would be provided to designate the bike lanes and paths. Street crossings and traffic signals would be provided.  [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
Surface Parking
Around 5,865 parking spaces are anticipated in aboveground parking garages in residential buildings, approximately 572 parking spaces would be provided along streets and another 141 parking spaces would be available within on-site parks.   [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
Underground parking
Approximately 5,065 parking spaces would be provided in below-grade parking spaces, including 4,746 south of the new stadium and 319 east of the new stadium. [if gte mso 9]> Normal 0 false false false EN-US X-NONE X-NONE Normal 0 false false false EN-US X-NONE X-NONE
P0 67’ to 70’ elevation
P1 62’ to 66’ elevation
P2 55’ elevation
P3 44’ elevation
Click below for overview